CO2 equivalent emissions from facility subparts C-II, SS, and TT (metric tons):188,166.6
CO2 equivalent emissions from supplier subparts LL-QQ (metric tons):
Biogenic CO2 emissions from facility subparts C-II, SS, and TT (metric tons):63.8
Cogeneration Unit Emissions Indicator:N
GHG Report Start Date:2020-01-01
GHG Report End Date:2020-12-31
Description of Changes to Calculation Methodology:In Subpart II, rather than reporting CH4 Emitted associated with 11 full weeks at 24 hours of operation per week (default calculations in e-GGRT), the emissions total has been manually revised to reflect 1,728 hours of operation (controlled). CH4 emissions were still calculated using the Subpart II equations II-6 and II-7. The uncontrolled CH4 emissions are reported separately, as tracked by the facility. This is a more accurate reflection of actual operation at the facility, rather than assuming the methanator was operating for 1,848 hours per year.
Plant Code Indicator:N
Primary NAICS Code:325193
Second Primary NAICS Code:
Parent Company Details:
Parent Company Name:KOCH INDUSTRIES INC
Address:4111 E 37th Street North,
Wichita,
KS 67220-3203
Percent Ownership Interest:100
Subpart C: General Stationary Fuel Combustion
Gas Information Details
Gas Name | Carbon Dioxide |
Gas Quantity | 187,957.8 (Metric Tons) |
Own Result? | |
Gas Name | Biogenic Carbon dioxide |
Gas Quantity | 63.8 (Metric Tons) |
Own Result? | |
Gas Name | Methane |
Gas Quantity | 3.54 (Metric Tons) |
Own Result? | |
Gas Name | Nitrous Oxide |
Gas Quantity | 0.355 (Metric Tons) |
Own Result? | |
Unit Details:
Unit Name : CP-1
Unit Type : OCS (Other combustion source)
Unit Description :
Other Unit Name :
Common Pipe Details:
Use Ivt Indicator: N
Maximum Rated Heat Input Capacity:
147.4
Cumulative Maximum Rated Heat Input Capacity:
561.4
Emission Details:
Annual Biogenic CO2 Emissions:
0
(metric tons)
Annual Fossil fuel based CO2 Emissions:
187957.8
(metric tons)
Tier Fuel Details:
Fuel :
Natural Gas (Weighted U.S. Average)
Tier Name :
Tier 1 (Equation C-1b, natural gas billing in mmBtu)
Tier Methodology Start Date :
2020-01-01
Tier Methodology End Date :
2020-12-31
Fuel Emission Details :
Total CO2 emissions | Total CH4 emissions | Total N2O emissions | Total CH4 emissions CO2e | Total N2O emissions CO2e |
187957.8
(Metric Tons)
|
3.54
(Metric Tons)
|
0.354
(Metric Tons)
|
88.6
(Metric Tons)
|
105.6
(Metric Tons)
|
Equation C1b/C8b Inputs :
Natural Gas Usage :
3542363
(mmBtu/year)
Unit Name : Dryer A
Unit Type : PD (Product or intermediate product dryer)
Unit Description :
Individual Unit Details:
Use Ivt Indicator: N
Maximum Rated Heat Input Capacity:
54.4
(mmBtu/hr)
Emission Details:
Annual CO2 mass emissions from sorbent: 0 (Metric Tons)
Annual Biogenic CO2 Emissions:
63.8
(metric tons)
Tier Fuel Details:
Fuel :
Other Biomass Gases
Tier Name :
Tier 1 (Equation C-1)
Tier Methodology Start Date :
2020-01-01
Tier Methodology End Date :
2020-12-31
Fuel Emission Details :
Total CO2 emissions | Total CH4 emissions | Total N2O emissions | Total CH4 emissions CO2e | Total N2O emissions CO2e |
63.8
(Metric Tons)
|
0.00
(Metric Tons)
|
0.001
(Metric Tons)
|
0.1
(Metric Tons)
|
0.2
(Metric Tons)
|
Equation C1/C8 Inputs :
Fuel Quantity :
1869451
(scf/year)
Subpart II: Industrial Wastewater Treatment
Gas Information Details
Gas Name | Methane |
Gas Quantity | 0.58 (Metric Tons) |
Own Result? | |
Anaerobic Process Information:
Name or ID: | Methanator |
Anaerobic Process: | Anaerobic Reactor |
Is biogas generated in the process recovered? | Yes |
Number of weeks that the system was operational: | 11 |
Document or diagram that pertains to this process: | |
Average depth of the lagoon: | |
Does the facility measure COD or BOD5 concentration of the wastewater entering the anaerobic process? | COD |
Does the facility perform an ethanol production processing operation? If yes, which process is used? | Dry milling process |
How does the facility monitor the CH4 concentration in the biogas collected for destruction? | Weekly monitoring |
Is the biogas temperature incorporated into the monitoring equipment internal calculations? | Yes |
Is the biogas pressure incorporated into the monitoring equipment internal calculations? | Yes |
Is the biogas moisture content incorporated into the monitoring equipment internal calculations? | Yes |
Was biogas flow measured on a wet or dry basis? | |
Was biogas CH4 concentration measured on a wet or dry basis? | |
Does CH4 destruction occur at the facility, off-site, or both? | On-Site |
CH4 collection efficiency (based on cover type): | 0.99 |
Annual mass of CH4 generated from anaerobic wastewater treatment process: | 27.06 (Metric Tons) |
Annual mass of CH4 emissions from anaerobic wastewater treatment process: | 0.58 (Metric Tons) |
Equation II-1 Inputs:
Week | Floww (m3) | MDP? | CODw (kg/m3) | MDP? | B0 (kg CH4/kg COD) | ALT? | MCF | ALT? |
1 | 3768.9 | | 3.25 | | 0.25 | | 0.8 | |
2 | 3752.8 | | 6.67 | | 0.25 | | 0.8 | |
3 | 4595.7 | | 3.61 | | 0.25 | | 0.8 | |
4 | 4654.9 | | 3.30 | | 0.25 | | 0.8 | |
5 | 2870.7 | | 3.61 | | 0.25 | | 0.8 | |
6 | 666.8 | | 3.25 | | 0.25 | | 0.8 | |
7 | 3913 | | 3.54 | | 0.25 | | 0.8 | |
8 | 2227.2 | | 2.99 | | 0.25 | | 0.8 | |
9 | 4425.9 | | 2.89 | | 0.25 | | 0.8 | |
10 | 4811.7 | | 2.89 | | 0.25 | | 0.8 | |
11 | 2423.8 | | 2.62 | | 0.25 | | 0.8 | |
Equation II-4 Inputs:
Week | Volumetric Biogas Flow (acf) | MDP? | Biogas CH4 Concentration (%) | MDP? | Biogas Temperature (°R) | Biogas Pressure (atm) | Biogas Moisture (cfw/cfb) |
1 | | | | | | | |
2 | | | | | | | |
3 | | | | | | | |
4 | | | | | | | |
5 | | | | | | | |
6 | | | | | | | |
7 | | | | | | | |
8 | | | | | | | |
9 | | | | Yes | | | |
10 | | | | | | | |
11 | | | | | | | |
Equation II-6 Inputs:
Rn: Annual quantity of CH4 recovered from the Anaerobic Process: | 29.05 (Metric Tons) |
Annual operating hours for the primary destruction device: | 1694 |
Destruction efficiency for the primary destruction device: | 0.99 |
Fraction of hours the primary destruction device was operating: | 0.912 |
Is a back-up destruction device present at the facility? | Yes |
Annual operating hours for the back-up destruction device: | 34 |
Destruction efficiency for the back-up destruction device: | 0.99 |
Fraction of hours the back-up destruction device was operating: | 0.019 |