Meter Name: Jackson Dome 100
Meter Description:
Meter Type: CO2 Flow Meter
Measurement Type: Mass
Annual Mass of CO2 (Metric Tons):
1181.5
Flow Meter Location: NA
Was CO2 Imported or Exported: NA
Dehydration Equipment Upstream? Y
Dehydration Equipment Downstream? N
Compression Equipment Upstream? Y
Compression Equipment Downstream? N
Other Processing Equipment Upstream? N
Other Processing Equipment Downstream? N
Other Processing Equipment Description:
Quarterly Mass Flow Data
Quarter | Mass Flow Rate | CO2 Concentration | Measurement Standard |
First Quarter | 768.39
(Metric Tons)
| 0.9957
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Second Quarter | 0.91
(Metric Tons)
| 0.9939
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Third Quarter | 114.31
(Metric Tons)
| 0.9908
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Fourth Quarter | 303.91
(Metric Tons)
| 0.9946
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Meter Name: Jackson Dome 101
Meter Description:
Meter Type: CO2 Flow Meter
Measurement Type: Mass
Annual Mass of CO2 (Metric Tons):
3422926.6
Flow Meter Location: NA
Was CO2 Imported or Exported: NA
Dehydration Equipment Upstream? Y
Dehydration Equipment Downstream? N
Compression Equipment Upstream? Y
Compression Equipment Downstream? N
Other Processing Equipment Upstream? N
Other Processing Equipment Downstream? N
Other Processing Equipment Description:
Quarterly Mass Flow Data
Quarter | Mass Flow Rate | CO2 Concentration | Measurement Standard |
First Quarter | 929449.33
(Metric Tons)
| 0.9957
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Second Quarter | 909220.72
(Metric Tons)
| 0.9939
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Third Quarter | 710301.19
(Metric Tons)
| 0.9908
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Fourth Quarter | 894865.28
(Metric Tons)
| 0.9946
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Meter Name: Jackson Dome 102
Meter Description:
Meter Type: CO2 Flow Meter
Measurement Type: Mass
Annual Mass of CO2 (Metric Tons):
1.3
Flow Meter Location: NA
Was CO2 Imported or Exported: NA
Dehydration Equipment Upstream? N
Dehydration Equipment Downstream? Y
Compression Equipment Upstream? Y
Compression Equipment Downstream? Y
Other Processing Equipment Upstream? N
Other Processing Equipment Downstream? N
Other Processing Equipment Description:
Quarterly Mass Flow Data
Quarter | Mass Flow Rate | CO2 Concentration | Measurement Standard |
First Quarter | 0
(Metric Tons)
| 0.9957
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Second Quarter | 0
(Metric Tons)
| 0.9939
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Third Quarter | 1.36
(Metric Tons)
| 0.9908
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |
Fourth Quarter | 0
(Metric Tons)
| 0.9946
(wt. %CO2 expressed as a fraction)
| AGA8 method, 1992 (detailed) and AGA NX-19 method from the AGA3 report. |